Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com

Ramsey County Highway Department

 Kevin Fieldsend, County Superintendent
Office Location - 919 5th St. South
Devils Lake, ND 58301

Phone: (701)662-7015
Fax: (701)662-7070

The Ramsey County Highway Department is charged with the responsibility to construct, maintain, and operate the county road system as designated and selected by the Board of County Commissioners.  A County Highway Superintendent is employed at the discretion of the Board of County Commissioners with the powers and duties as per North Dakota Century Code Chapter 11-31.

Under the direction and supervision of the Board of County Commissioners, the County Highway Superintendent shall:

1.  Design and make plans for county highway projects.

2.  Set up a comprehensive plan of county highways, showing by the use of maps, existing roads, operations in progress, and future plans.

3.  Supervise county construction and maintenance operations pertaining to highways and bridges.

4.  Keep a complete record of costs and expenditures.

5.  Check all accounts, claims, and demands for expenditures in connection with all matters supervised by and indicate the county superintendent's recommendation prior to the submission of such accounts, claims, and demands to the board of county commissioners.

6.  Keep a complete inventory of all equipment, repairs, fuel and oil, and miscellaneous items.

7.  Supervise the use and disposition of all county-owned road equipment and materials.

8.  Employ and supervise all other personnel engaged in county road operations, terminating such employment when required in the best interest of the county.

9.  Prepare and submit to the board of county commissioners a complete yearly report and such additional reports as may be required by the board of county commissioners at any time.

10. Cooperate with the Federal Highway Administration, the North Dakota Department of Transportation, and the townships and cities located within the county.

11. Perform such other duties as may be designated by the board of county commissioners.

RAMSEY COUNTY HIGHWAY DEPARTMENT FIVE YEAR PLAN

GRAVEL
- Revised: 02/26/2010
YEAR
PROJECT LOCATION
LENGTH
ESTIMATED COST
COUNTY FUND
2010
Ramsey County Cavalier Line From Hampden to Towner County Line

12 Miles

$66,000.00
County Road
2010
Ramsey County #8D From State Hwy #1 East to County Line

3 Miles

$16,000.00
County Road
2010
Ramsey County #7C From State Hwy#1 to County Line
3 Miles
$17,000.00
County Road
2010
Ramsey County #7A From Ramsey County #4 to Brocket
9 Miles
$52,000.00
County Road
2010
Ramsey County #2W From Grand Harbor 5 Miles West & 7 Miles North - Township Pay Their Share
12 Miles
$72,000.00 3/4= $54,000.00
County Road
2011
Ramsey County #4C From Ramsey County #7 North to Ramsey County #8
6 Miles
$33,000.00
County Road
2011
Ramsey County #6 From Ramsey County #4 to Nelson County Line
6 Miles
$34,000.00
County Road
2011
Ramsey County #4E From US Hwy. 2 South to Ramsey/Benson County Line
9.5 Miles
$53,000.00
County Road
2011
Ramsey/Nelson County Line From US Hwy # 2 North 8 Miles to Ramsey County # 6
8 Miles
$44,000.00
County Road
2012
Ramsey County #4A From Ramsey/Cavalier County Line to State Hwy. 17
9 Miles
$52,000.00
County Road
2012
Ramsey County #9A From State Hwy. 20 East to Ramsey County #3
10 Miles
$55,000.00
County Road
2013
Benson/Ramsey County Line From Churchs Ferry South 7 Miles
7 Miles
$42,000.00 1/2= $21,000.00
County Road
2014
Old Turn Back #17 From Ramsey/Towner Line and 6 Miles East (If Townships Agree to Pay Their Share 500 Yds Per Mile
6 Miles
$36,000.00 3/4= $27,000.00
County Road
2015
Ramsey County #10 from State Hwy 20 W 9.5 Miles
9.5 Miles
$57,000.00
County Road
2015
Crary Road from Crary North to Ramsey County #2
2.5 Miles
$15,000.00
County Road
2015
Ramsey County #9B From Ramsey County #3 East to Ramsey County #4 

7 Miles

?
County Road

           

PROJECTS
- Revised: 02/26/2010
YEAR
PROJECT LOCATION
LENGTH
ESTIMATED COST
COUNTY FUND
2010
Wood/Rutten Road
3.5 Miles
$1,767,000.00
 
2011
RC #8 FROM RC #4 EAST TO ND 1 -
PRELIMINARY ENGINEERING
9 Miles
$30,000.00
Blacktop
2012
Overlay Ramsey County # 8 From Ramsey County #4 East to ND State Hwy. 1
9 Miles
?
Blacktop
2013
Overlay Ramsey County #9 From Ramsey County #4 to Walsh County Line - Preliminary Engineering
9 Miles
To Be Evaluated
Blacktop
2014
Overlay Ramsey County #9 From Ramsey County #4 to Walsh County Line - Construction
9 Miles
To Be Evaluated
Blacktop
2015
Overlay Ramsey County #8 From ND State Hwy. 20 to Ramsey County #4 - Preliminary Engineering
16 Miles
$30,000.00
Blacktop
2016
Overlay Ramsey County #8 From ND State Hwy. 20 to Ramsey County #4 - Construction
16 Miles
?
Blacktop
2017
Overlay Ramsey County #3 From ND State Hwy. 17 to Cavalier County Line - Preliminary Engineering
10 Miles
$25,000.00
Blacktop
2018
Overlay Ramsey County # 3 From ND State Hwy. 17 to Cavalier County Line - Construction
10 Miles
?
Blacktop
2019
Overlay Ramsey County #2 From Devils Lake to Ramsey County #4 - Preliminary Engineering
14 Miles
$30,000.00
Blacktop
2020
Overlay Ramsey County #2 From Devils Lake to Ramsey County #4 - Construction
14 Miles
?
Blacktop
2021
Overlay Ramsey County #3 From ND State Hwy. 17 South to Ramsey County #8 - Preliminary Engineering
9 Miles
$20,000.00
Blacktop
2022
Overlay Elks Drive
1 Mile
?
 
2022
Overlay Ramsey County #3 From ND State Hwy. 17 South to Ramsey County #8 - Construction
9 Miles
?
Blacktop
2023
Overlay Ramsey County #4 From Ramsey County #8 North to ND State Hwy. 17 - Preliminary Engineering
9 Miles
$25,000.00
Blacktop
2024
Crary Road from Crary 1 1/2 Miles South to US Hwy. 2 - Overlay Ramsey County #7 From ND State Hwy. 1 West to RailRoad Track
2.5 Miles
?
County Road
2024
Overlay Ramsey County #4 From Ramsey County #8 North to ND State Hwy. 17 - Construction
9 Miles
?
Blacktop
2025
Overlay Ramsey County #3 From Ramsey County #8 South to Ramsey County #2- Preliminary Engineering
12 Miles
$35,000.00
Blacktop
2026
Overlay Ramsey County #3 From Ramsey County # 8 South to Ramsey County #2- Construction
12 Miles
?
Blacktop
2027
Overlay Ramsey County #4 From US Hwy. 2 North to Ramsey County #7 - Preliminary Engineering
11 Mile
$45,000.00
Blacktop
2028
Overlay Ramsey County # 4 From US Hwy. 2 North to Ramsey County #7 - Construction
11 Miles
?
Blacktop
  Ramsey County #1      
  Walley Drive      
  Military Road      
  Grahams Island Road      

 

CHIPSEAL
- Revised: 02/26/2010
YEAR
PROJECT LOCATION
LENGTH
ESTIMATED COST
COUNTY FUND
2010
Ramsey County #4B From ND State Hwy 17 to Ramsey County #8C & Ramsey County #8 From Ramsey County #4 to Lawton
17 Miles
$306,000.00

County Road Program

2011
Ramsey County #4D From Ramsey County #7 to US Hwy. 2 & Brocket Road, RC #1, Military Road, Walleye Drive
18 Miles
$324,000.00
County Road Program
2012
Ramsey County #2 From Devils Lake to Ramsey County #4 & Elks Road & Crary Road
17 Miles
$306,000.00
County Road Program
2013
Ramsey County #8A & #8B From Webster to Ramsey County #4B
16 Miles
$296,000.00
County Road Program
2014
Ramsey County #3B & Ramsey County #3C From ND State Hwy 17 South to Ramsey County #2
21 Miles
$390,000.00

County Road Program

2015
Ramsey County #3A From ND State Hwy 17 North to County Line & Ramsey County #9C From Ramsey County #4 East to County Line
19 Miles
?

County Road Program

 

BRIDGES
- Revised: 02/26/2010
YEAR
BRIDGE LOCATION & BRIDGE NUMBER
TON RATING
ESTIMATED COST
COUNTY FUND
 

REMOVE BRIDGES AND REPLACE WITH CULVERTS

 
 
 
2010
133-02 PROSPECT SEC 11/14
19
Bridge
2010
133-02.1 PROSPECT SEC 11/14
19
Bridge
2010
137-11 NEWLAND SEC 28/33
18
 
Bridge
2010
137-13 LAWTON 5/6
18
Bridge
2010
139-08 NEWLAND SEC 13/14
18
Bridge
2010
140-07 NEWLAND SEC 1/12
20
 
Bridge
2010
138-6.1 HIGHLAND CENTER SEC 34/35
23
 
Bridge
2010
127-13.0 CATO TWP SEC 3/4
26
 
Bridge
 BRIDGES ELIGIBLE FOR FEDERAL FUNDING
TON RATING

RATINGS

 
135-07.0 NEWLAND TWP SEC 6/7
17
6
Bridge
136-07.2 NEWLAND TWP SEC 5/8  
6
Bridge
134-14.0 TRIUMPH TWP SEC 10/15  
5
Bridge
136-11.0 NEWLAND TWP SEC 28/29  
2
Bridge
116-19.0 FRESHWATER SEC 2/3
25
1
Bridge
124-15.0 HARDING SEC 13 CATO SEC 18
17
1
Bridge
126-14.0 CATO TWP SEC 8/9  
1
Bridge
105-16.0 CHAIN LAKES TWP SEC 23/24  
0
Bridge
107-13.0 DEGROAT TWP SEC 6/7  
0
Bridge

| HOME | DEPARTMENTS | MEETINGS | INFORMATION | EMPLOYMENT | CITIES | LINKS | CONTACTS |

Search this site powered by FreeFind

© 2009 Ramsey County North Dakota - All Rights Reserved
Deisnged and Hosted by NDTC